Plumbing Installation
Now that the old steel plumbing has been removed we can install the new CPVC pipe.
Rough-in of the shower plumbing.
Rough-in of the sink piping.
Supply lines for the washing machine and hose bibb.
The shower lines and fittings.
Sink supply lines. A tricky fit, since there's a sink on the other side of the wall that needs to be supplied as well. The hardest part is keeping straight Hot and Cold. :-)
Up to Bathroom Remodel