In January 2004 we began to remodel the bathroom. This was to be a significant remodel job: the tub was to be replaced, the vanity refinished, new tiling, flooring, plumbing, wiring... almost everything in the room would be upgraded.
Click the links below to view pictures from the various stages of this job.
We finished work on the bathroom in August 2004. The job took a little longer than we expected, but we couldn't be happier with the results.